Finishing Polished, Surface treatment Galavanized Locking Assembly Canto-Lock - C-2011, Material SS, Application Chemical industries
Active
Premium
Key Highlights
₹ 670.00
per Piece (pcs)
MOQ
1
Available Variants
Technical Specifications
| Parameter | Value |
|---|---|
| Diameter | 14 mm |
| Material | SS |
| Finishing | Polished |
| Application | Chemical industries |
| Country of Origin | Made in India |
| Surface treatment | Galavanized |
| Minimum Order Quantity | 10 Number |
Product Description
Reliable Galvanized Locking Assembly Solutions in Pune, Maharashtra
For the axle and core bore, A surface finish of ra2 with a, Is specified recommended mounting tolerance of h8 for the shaft and h83 for the hub Avoid using lubricants; this item is founded upon molybdenum disulfide from Molykote oilinstallation and removal instruction for canto, Lock shrink disc series c, 2011canto, Lock c, 2011 shrink discs is provided fully prepared for installation. However, Prior to tightening of locking screws it necessary to remove wooden spacers that may have been used during shipping. Installationimportant never tighten locking screws prior to as inner, Shaft installation ring of shrink disc and/or hub can be permanently contracted even at relatively low tightening torques. 1. Clean hub od and shrink disc bore. Lightly lubricate hub od before assembling shrink disc on hub. 2. Carefully solvent clean and dry shaft and hub bore of any lubricant prior to mounting hub onto shaft. This step as any, Is critical lubricant on the shaft/hub bore interface will greatly reduce the torque transmitting capacity of the shrink disc connection3. Insert shaft into hub, Then position shrink disc onto hub. After confirming correct position of hub and shrink disc, Hand, Tighten three 3 or four 4 evenly spaced fasteners with locking mechanisms and ensure that outer collars of shrink disc are parallel. Hand, Tighten remaining locking screws4. Adjust the torque wrench to a setting close to 5% Exceeding the outlined specifications locking screw torque for secure fastening . Tighten locking screws in either a clockwise or using approx, Counterclockwise sequence. % . E., 90 turns even if initially some locking screws require a very low tightening torque to achieve % turns for several passes until turns can no longer be achieved. 5. Continue to apply overtorque suitable for one or two additional passes. This must be compensate for a framework designed for tranquility of locking screws since tightening of any specific screw is guaranteed to relax adjacent screws. Without overtorquing, Countless adjustments will be required to achieve the desired level of tightness torque. 6 Adjust the torque wrench to the designated torque ts and verify that all locking screws are secure. At this stage, No screw should rotate; if take action, It does repeat step 5 for 1 or 2 more passes once the screws are tightened, Check the parallelism of the considering that, Outer collars the maximum allowed error s 0. 35% of the outer diameter of shrink disc. A larger error could cause a reduced performances, Loss of as a, Pressure and consequence. There is there's no requirement to verify the tightening torque after the equipment has been installed in operationremovalnote Before starting the upcoming verify that, Removal process there are no torque or thrust loads are in operation of the shrink disc, Rod or whatever mounted components. Loosen all locking screws in several stages by using approx. Turns, Following either a clockwise or until shrink, Counterclockwise sequence disc can be moved on hub. The shrink disc, Hub and shaft will return to their original fit clearances. Warningdo not completely remove locking screws before locking rings are disengaged. As sudden separation of locking rings could involve high separation forces that may result in permanent injury or death. Be certain that locking rings are disengaged before completely removing locking screws
Shipping Information
Availability
In Stock
Price
Excluding all taxes
Ships from
Mumbai
Delivery Location
All India delivery available
Shipping
As per delivery location
Seller Information
P
P. B. Traders
Verified
Pune, Maharashtra, India
Established:
2016
Delivery Time:
60+ Business Days
Shipping Options:
Trust & Safety
Trade Assurance Protected
Secure Payment Methods
Logistics Tracking Available
24/7 Customer Support